A MIM manufacturer produces small, complex metal parts by molding a metal-powder feedstock, then debinding and sintering it to full density. Ningbo Precision Tech is a metal injection molding factory in Ningbo, China, running stainless steel, low-alloy steel, titanium, tungsten and soft magnetic alloys at 50+ million pieces per year, ISO 9001 certified.
A MIM factory is not a machine shop with an extra process. It takes a drawing or STEP file, builds a steel mold, compounds feedstock in-house, molds the green part, debinds and sinters it, then adds only the secondary operations the tolerance actually requires. Your engineering team reviews DFM feedback and first articles — not the sintering curve.
Three things separate a factory from a trading company:
| Item | Capability |
|---|---|
| Location | Ningbo, Zhejiang, China |
| Process | Metal injection molding (MIM), plus machining, heat treatment, plating and assembly |
| Materials | 316L, 17-4PH, 420, 440C, SUS304, Fe-2Ni, Fe-8Ni, 8620, 4140, M2, D2, Inconel 718, Ti-6Al-4V, WC-Co, W-Ni-Fe, Fe50Ni, Fe-Si, copper, Kovar |
| Part weight | 0.1–150 g typical; up to 250 g demonstrated |
| As-sintered tolerance | ±0.3% of dimension; ±0.5% on complex net-shape features |
| Sintered density | >97% typical |
| Minimum wall | 0.3 mm; under 6 mm recommended |
| Capacity | 50+ million pieces per year |
| Mold life | 100,000+ shots |
| Typical batch | 10,000+ pcs/year for production economics; prototypes from 500–1,000 pcs |
| Lead time | 5–8 weeks from design release to tooling and samples |
| Quality system | ISO 9001 |
| Reference customers | Panasonic, Fukuda |
Use this checklist on us, or on any other factory quoting the same part.
| Check | What good looks like | Red flag |
|---|---|---|
| Feedstock | Compounded in-house or from a named supplier with lot traceability | "We source it" with no name |
| Furnace | Continuous or batch sintering under atmosphere control, profiles logged | Sintering subcontracted |
| Density data | Sintered density reported per lot, typically >97% | Only "high density" claimed |
| Tolerance evidence | Cpk or dimensional reports on a part like yours | "±0.3% guaranteed" with no data |
| Secondary operations | Machining, heat treatment and plating handled or managed in one place | Every operation brokered out |
| Quality system | ISO 9001 certificate with a current scope | Certificate for a different site |
| Communication | DFM feedback before quoting | Price first, questions never |
| References | Named OEM customers you can check | "Confidential" for everything |
Tensile data by grade: MIM material properties. Grade-by-application matrix: MIM materials and applications. Process detail: metal injection molding process. Comparison with other processes: MIM vs CNC vs casting.
A factory. The plant is in Ningbo, Zhejiang, China, with in-house feedstock compounding, molding, debinding, sintering and secondary operations.
Prototypes from 500–1,000 pieces. Production economics turn at 10,000+ pieces per year; below that we still quote and will say if CNC or casting is cheaper.
Yes. We work from customer drawings, STEP files and material specs, and return DFM feedback before quoting. First articles come with a dimensional report.
ISO 9001 system, SPC on critical dimensions, material certificates per lot, and change control on process or material changes.
5–8 weeks from design release to tooling and samples; a custom gear runs 8–10 weeks total.
Panasonic and Fukuda, among others, across automotive, medical, consumer electronics and industrial applications.